Home › Kitchen Remodeling › Hollywood
Gold Hands offers kitchen remodeling in Hollywood, FL: new or refaced cabinets, quartz and granite counters templated and fabricated by the stone shop while we coordinate, tile backsplash, and the plumbing and electrical finish work that ties it together. Pricing is per project. Text photos of the kitchen with a few wall measurements and we send a free written estimate.
Around Hollywood and Fort Lauderdale, Dania Beach and Hallandale Beach, the kitchen is often the room that has been patched the most: a replacement microwave that does not match, a faucet swapped twice, a counter seam that lifted. A remodel lets you fix those small things at once and plan the room as a whole: where the trash pull-out goes, which outlet feeds the coffee maker, how light falls on the cutting board, and where the dishwasher drains.
Start with your phone camera. Stand in each corner and take a photo toward the opposite one, then shoot inside the sink cabinet, any water stains, and the electrical panel label if you can reach it. Measure each wall that has cabinets. Send everything by text or WhatsApp to (786) 788-8714. The estimate is free and priced per project, and Spanish is spoken at every step.
Call (786) 788-8714 · Get a free quote
Priced per project — free estimate by phone, video call or from your photos and measurements. Gold Hands Miami is insured. Permitted work (plumbing, electrical, structural changes) is pulled and performed under our Florida-licensed general contractor partner.
Remodeling a kitchen in a mid-century Hollywood house
Hollywood has 1920s-to-1950s bungalows around downtown and Young Circle, 1950s-to-1970s block houses in Hollywood Hills and Emerald Hills, and condos and older homes packed onto the beach side.
In Hollywood Beach, Emerald Hills, Hollywood Lakes and Young Circle, many kitchens have already been remodeled once, often decades ago, right over the original materials. We regularly find two layers of flooring over terrazzo, a dropped ceiling hiding the old plaster, and cabinets shimmed to make up for floors that are not level. Discovering this in planning is better than mid-project, so we ask for photos of the floor edges, the ceiling and the inside of the cabinets.
Terrazzo under the kitchen can be a gift or a complication. Some owners want it restored and run through the house; others prefer tile or plank over it. Plaster walls take anchors and tile differently than drywall, and older windows may set the height of the backsplash. We talk through these choices before the estimate is final, so the price reflects the house you actually have.
Kitchen work we handle in Hollywood
Here is what a typical kitchen project covers, from the cabinet boxes to the last outlet cover and caulk line.
- New base, wall and tall pantry cabinets, leveled and secured to studs or block
- Cabinet refacing: new doors, drawer fronts and veneer over sound existing boxes
- Soft-close hinges, full-extension drawer slides, pull-outs and new hardware
- Countertop coordination with the stone shop: template, scheduling and install day
- Undermount or farmhouse sink setting with faucet, disposal and supply line hookup
- Tile backsplash in ceramic, porcelain, glass or stone, with sealed grout
- Dishwasher, range, cooktop, wall oven, range hood and microwave installation
- Under-cabinet lighting and fixture swaps on existing circuits
Kitchen Remodeling: levels & budget
Refresh
Quoted per project
Cabinet refacing or painting, new hardware, backsplash, sink, faucet and lighting — keeping the layout.
Full remodel
Most projects $15,000–$30,000
New cabinets and countertops, backsplash, sink and fixtures, appliance installation and lighting.
Custom & luxury
$30,000+
New layout or island, relocated plumbing and electrical, premium stone and custom cabinetry — permitted through our GC partner.
Typical ranges, not a quote: your price is a written line-item quote after photos and measurements or a video call, approved before anything is ordered.
Finish ideas


Illustrative images — not photos of a specific Gold Hands project.
Coastal kitchens in Hollywood: salt air and humidity
In Hollywood Beach, Emerald Hills, Hollywood Lakes and Young Circle and other coastal parts of Hollywood, owners often find that a kitchen remodeled not long ago with indoor-grade materials did not last. Rust on hinges, delaminating cabinet edges and pitted faucets are typical. A second remodel is a good time to choose hardware and fixtures made for humid, salty air, even if they cost more up front. Replacing them twice ends up worse.
Coastal properties also need scheduling around storms. Hurricane season runs from June 1 to November 30, and when a storm threatens, we stop, secure materials and clear the site. Stone and cabinet deliveries can shift when shipping is disrupted. We build that possibility into the plan, keep your water and power usable at the end of each day and tell you early if dates move.
Our kitchen remodeling process
- Free estimate: send wall photos, the inside of the sink base and rough measurements by text or WhatsApp. If a detail is unclear, we ask for another photo instead of guessing.
- Scope in writing: each item is listed separately, from demolition to the last outlet cover, with the material choices, the sequence and a start date tied to when cabinets and stone are ready.
- Permits: any plumbing, electrical or structural change is pulled by our general contractor partner with the City of Hollywood building department. Condo or HOA approval, if needed, runs alongside so both are ready before demolition.
- Installation: cabinets are leveled and secured, the stone shop templates and fabricates the counters we coordinate, then tile, plumbing fixtures, appliances and lights go in, with the rest of the house protected throughout.
- Closeout: a walkthrough together, a punch list finished before we leave, debris hauled away and a set of photos documenting the completed kitchen for your records.
Kitchen remodel timing: short jobs and long ones
A kitchen refresh that keeps the cabinets, such as paint, hardware, a backsplash and a new faucet, is usually a matter of days. A replacement with new cabinets and countertops takes longer, mostly because the stone shop can only template after the cabinets are installed and then needs time to fabricate. During that gap you have cabinets but no counters, so we plan a temporary sink setup where possible.
Kitchen Remodeling near Hollywood
Nearby: Kitchen Remodeling — Fort Lauderdale · Kitchen Remodeling — Dania Beach · Kitchen Remodeling — Hallandale Beach.
All areas: Kitchen Remodeling across Miami-Dade, Broward and Palm Beach. Planning guide: Planning a Kitchen Remodel in South Florida: What to Know.
Neighborhoods and ZIP codes we cover in Hollywood
- Hollywood Beach (33019)
- Hollywood Central (33020)
- Hollywood Hills (33021)
Kitchen Remodeling in Hollywood — questions we get asked
Can I move the sink in a high-rise kitchen in Hollywood?
Sometimes, but it is often the hardest change in a tower. Drains run through the concrete slab to shared risers, and moving them may require coring, engineering review, association approval and a permit. Many owners keep the sink where it is and change everything around it. We look at your floor plan and tell you what is realistic before you design around a new sink location.
Which kitchen materials hold up near the ocean?
Plywood cabinet boxes, stainless or solid brass hardware, quartz or sealed granite counters and porcelain backsplash tile tolerate humidity and salt air better than particleboard, plated hardware and porous stone. Fixtures rated for outdoor or marine use resist pitting. We point out where a cheaper option is likely to corrode or swell near the coast, so you can choose with that in mind.
How do you estimate a kitchen remodel without coming to the house?
You send photos of each wall, the inside of the sink cabinet and the floor, plus counter lengths and ceiling height, by text or WhatsApp to (786) 788-8714. That is enough to price most kitchens. The estimate is free and priced per project. If something can only be judged in person, we tell you and can arrange a paid site visit.
Does hurricane season affect my kitchen project?
It can. Hurricane season runs from June 1 to November 30. Shipping delays can push cabinet and stone deliveries, and if a storm approaches we stop work, secure materials and clear the site. We order early, avoid leaving the kitchen open longer than necessary and tell you right away when a date moves.
Who handles cleanup and debris?
We do. Old cabinets, counters, tile and packaging are hauled away as part of the job, and the work area is swept and vacuumed at the end of each day. Before the final walkthrough we clean dust from cabinets inside and out, wipe down counters and appliances and remove floor protection. Where a condo has debris rules, we follow them.
Other work we do in Hollywood
- Airbnb & Short-Term Rental Maintenance in Hollywood
- Bathroom Remodeling in Hollywood
- Ceiling Fan Installation & Repair in Hollywood
- Closet Organization & Wire Shelving in Hollywood
- Deck Railing & Stair Repair in Hollywood
- Door Repair & Installation in Hollywood
- Ceiling & Drywall Repair in Hollywood
- Faucet Installation & Repair in Hollywood
- Gate & Fence Hardware Repair in Hollywood
- Furniture Assembly in Hollywood
- Garbage Disposal Installation in Hollywood
- Light Fixture Installation in Hollywood
- Interior & Exterior Painting in Hollywood
- Picture & Mirror Hanging in Hollywood
- Shelf & Closet System Installation in Hollywood
- Tile Installation in Hollywood
- Toilet Installation & Repair in Hollywood
- TV Mounting & Cable Concealment in Hollywood
Need kitchen remodeling in Hollywood?
Send photographs of the job to (786) 788-8714 and a written quote comes back naming the scope and the materials. The quote costs nothing, and nothing reaches the invoice that was not on it.